Clean ROOM ISO 8
Clean ROOM ISO 8
EXW VB più IVA
50.000 €
Anno di produzione
2020
Condizione
Usato
(perfettamente funzionante)
Ubicazione
Łódź 

Dati essenziali
- Descrizione macchina:
- Clean ROOM ISO 8
- Anno di produzione:
- 2020
- Condizione:
- eccellente (usata)
- Funzionalità:
- perfettamente funzionante
Prezzo e posizione
EXW VB più IVA
50.000 €
- Ubicazione:
- Łódź, Polonia

Chiamata
Dettagli dell'offerta
- ID dell'annuncio:
- A14477200
- Aggiornamento:
- ultimo aggiornamento il 02.01.2024
Descrizione
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
Bsdpfoq H H Ruox Abbslp
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
L'annuncio è stato tradotto automaticamente e possono essersi verificati degli errori di traduzione.
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
Bsdpfoq H H Ruox Abbslp
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
L'annuncio è stato tradotto automaticamente e possono essersi verificati degli errori di traduzione.
Venditore
Nota: Registrati gratuitamente o accedi, per visualizzare tutte le informazioni.
Registrato da: 2023
1 annuncio online
Invia richiesta
Telefono & Fax
+48 728 4... mostra
Potresti essere interessato anche a questi annunci.
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Cesoia a ghigliottina - idraulica
STEINERHTS 30/16
STEINERHTS 30/16
Riuscito
Il tuo messaggio è stato inviato.
Annuncio economico
Meiningen
982 km
Forno a camera elettrico, temperatura massima 260 gradi.
NaberthermN9000/26 HAS 1 9000 LIter
NaberthermN9000/26 HAS 1 9000 LIter
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Centro di lavoro verticale
AXAVario
AXAVario
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Cesoia a ghigliottina - idraulica
EHTTSS 16 - 20
EHTTSS 16 - 20
Riuscito
Il tuo messaggio è stato inviato.
Annuncio economico
Emmendingen
788 km
Elumatec MGS142 Retrofit / Lupberger APM
ElumatecMGS142 mit Pusher
ElumatecMGS142 mit Pusher
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Fresatrice
STANKOSMO 32 TNC
STANKOSMO 32 TNC
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Fresatrice - Universale
MAHOMH 500 C (CNC)
MAHOMH 500 C (CNC)
Riuscito
Il tuo messaggio è stato inviato.
Annuncio economico
Wuppertal
1.123 km
Pressa da spotting
HESSMERT160 EST
HESSMERT160 EST
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Fresatrice - Universale
DECKELFP4 CC/T CNC
DECKELFP4 CC/T CNC
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Levigatrici a nastro
LÖSERSO-790
LÖSERSO-790
Riuscito
Il tuo messaggio è stato inviato.
Annuncio economico
St. Gallen
668 km
Sistema di pulizia a ultrasuoni
Ultraschallreinigungsanlage BR-80BR-80-M
Ultraschallreinigungsanlage BR-80BR-80-M
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Fresatrice - Universale
DECKELFP5A CNC
DECKELFP5A CNC
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Fresatrice - Universale
MAHOMH 600 E (CNC)
MAHOMH 600 E (CNC)
Riuscito
Il tuo messaggio è stato inviato.
Annuncio economico
Güglingen
847 km
Unità di ventilazione, condizionatore d'aria, raffreddamento della sala
IKGIKL150
IKGIKL150
Riuscito
Il tuo messaggio è stato inviato.
Asta
Termina tra
d
h
min
s
Asta finita
Nordrhein-Westfalen
1.122 km
Tornio a letto mobile
HEYLIGENSTAEDT260 EV/1250
HEYLIGENSTAEDT260 EV/1250
Il tuo annuncio è stato cancellato con successo
Si è verificato un errore






































































































































